Çatalağzı Thermal Power Plant (ÇATES), which was established in Çatalağzı, Zonguldak, to contribute to the increasing electrical energy needs of the growing industry of our country, today serves with a total installed capacity of 314.68 MW and an annual production capacity of 2,286,GWh. As Çelikerler Steel Construction, in order to contribute to this energy need, we implemented the Çatalağzı Thermal Power Plant Conveyor Line project in 2021, using exactly 550 tonnes of steel. While supporting energy production with this project, we also had the opportunity to show our engineering and production power in another type of structure where steel is used. As in every field, our successful works in the field of energy production continue at full speed.